Skip to main content

Preparations

During preparation, Anton sets up a station and founds issues:

  • transceiver needs a telepgraph keyer.

Antennas:

  • decided to try End Fed Random Wire with UnUn 1:4
  • decided to use vertical delta loop with highest point of 7 m